LEED points available from using Partition Systems products


LEED section and credit description                               

Materials & Resources

PS-350  
Corporate       Executive

Credit 2.1 & 2.2 Construction waste management 


Very little of the waste produced during installation would need to be sent to landfill, most can be locally recycled.

        
up to 2   

         
up to 2       

      
up to 2

 

Credit 3.1 & 3.2 Resource Reuse     


When the building is renovated our wall systems can be taken apart and the materials re-used in the new configuration.
 

         

up to 2   

         

up to 2   

    

up to 2   

 
Credit 4.1 recycled content   
 

Most of the materials used in our wall systems contain recycled materials

 

up to 1

 

up to 1

 

up to 1


Credit 5.1 Regional materials


Well over 10% of the materials are manufactured within Alberta, and a good portion are manufactured in Edmonton



up to 1

         

up to 1

     

up to 1


Indoor Environmental Quality


Credit 4.1 & 4.2 Low-emitting materials    
      

Our installation process uses very little if any adhesives or sealants on site. The wall surfaces are pre-finished in the factory so there would be little if any VOC’s given off on site.
up to 2
up to 2
up to 2